![]() Unfortunately, our proposed system uses air cooled chillers and we are having a hard time achieving the required savings.Īccording to the USGBC, projects outside the U.S. The total area for the buildings is greater than 150,000 sq ft, therefore system 8 applies to the baseline case model. We have a project that consists of two connected buildings: an admin building and a factory building.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |